Problem port up/down with Virtual-Chassis 2x6900

Post Reply
sito82_viso
Member
Posts: 6
Joined: 16 Mar 2015 15:19

Problem port up/down with Virtual-Chassis 2x6900

Post by sito82_viso »

Hello all,

I need any help about this issue. I will explain the topology:

We have two switchs 6900 Model setting as Virtual-Chassis.

OS6900 ----VFL-----OS6900
(Master) (Slave)

We have some servers with two NICs. Each NIC is connected to one port of each switch. For example:

Server1 nic 1 -----to----- OS-Master port 1
Server1 nic 2 -----to----- OS-Slave port 1
(and so on)
Servern nic 1 -----to----- OS-Master port n
Servern nic 1 -----to----- OS-Slave port n

The main issue is that some ports is down instead of the fiber is connected properly between the switch and the server.

The system is versión is: "Description: Alcatel-Lucent OS6900-X40 7.3.3.384.R01 GA, December 08, 2013.,"

We have checked the log and we haven't found any information about this problem. Also, we have checked the SFP transceivers and everything is ok.

Anybody have an idea about what is it the solution?

Thanks in advanced,

Best Regards,
devnull
Alcatel Unleashed Certified Guru
Alcatel Unleashed Certified Guru
Posts: 976
Joined: 07 Sep 2010 10:16
Location: Germany

Re: Problem port up/down with Virtual-Chassis 2x6900

Post by devnull »

How did you setup the Servers?
Do you use LACP to connect to the VC? What Software is running on the Serverside?
I have seen setups using VMWare running LACP on a distributed switch as well as kind of redundant port, where the second port is used only as failover.

Is the second port working when you connect only that port?

As general: upgrade to latest release (7.3.3.589) just to rule out quirks that occur often in GA releases.
sito82_viso
Member
Posts: 6
Joined: 16 Mar 2015 15:19

Re: Problem port up/down with Virtual-Chassis 2x6900

Post by sito82_viso »

Hi,

The servers are RedHat Enterprise and we have configured bonding connections in mode Active/Passive, so at the side of the switches we haven't configured LACP... one port is active and the other port is used only for failover.

We have requested a new reléase in order to upgrade. We will try this way.

Thanks for the response,

Best Regards,
sputniki
Member
Posts: 32
Joined: 27 Jan 2010 10:35

Re: Problem port up/down with Virtual-Chassis 2x6900

Post by sputniki »

Did the new release solve the problem? To which release did you upgrade? (and where did you come from)
sito82_viso wrote:Hi,

We have requested a new reléase in order to upgrade. We will try this way.

Best Regards,
Post Reply